Milestone
1994
Established TECHWISE Circuits Co.,Ltd.and started to build
our modern PCB production plant in China
1995
We further broadened our business base by acquiring shares
in Uniplus Electronics Co. Ltd. (Taiwan)
1996
Start production capacity in TECHWISE to 230K sq.ft.and
acquire ISO 9002, UL Certification.
1997
Established HuiYang Uniplus Technology Ltd. in China (mass
lamination).Further expanded the production capacity in
TECHWISE to 350K sq.ftper month.Manufacturing processes
was well-recognized and approval by 3DFX,ACT,ADAPTEC,AZTECH,COMPAQ,
CREATIVE, ENI, HP,QDI,MOTOROLA, SHIRAI
1998
(AIWA, MATSUSHITA,BROTHER, TOSHIBA) VISIONTEK, WKK (NEC),XETEL
and other international corporation.
1999
Expanded the production capacity in TECHWISE to 500K sq.ft./month
2000
Expanded the production capacity in TECHWISE to 700K sq.ft./month
and acquire QS 9000 Certificate Going to expand the production
capacity in TECHWISE to 1,000K sq.ft./month and acquire
ISO 14000 Certificate
2001
1.A new factory is set up to boost capacity
up to 120k sq.metre/month
2.Modification of drilling and PTH &
Plating technique makes the production of PTFE models stand
to the requirement.
3.Our acid etching machine is capable
of handling 3 mil/3 mil inner layer board with the line
width tolerance of \10%(minimum board thickness:4 mil).
4.High Tg (180<C) material (Getek, BT,
etc.) are used for production of multi-layer boards.
2002
1.A new etching line helps to control the
impedance within the tolerance of \8%.
2.PTH line can achieve following parametres
as 12 mil minimum hloe diameter, 8:1aspectratio,\2 mil position
accuracy, 40 mil via hole space.
3.Our developing machine is able to
deal with a strict requirement of 3 mil solder dam as well
as 3 mil solder mask bridge. Also, a semi-automatic exposer
with a misregistration tolerance of \3 mil is employed in
our factory.
4.Suep (Surface Uniform Etching Process)
is applied to 3 mil/3 mil outer layer to reduce copper thickness.
2003
1.Implemented ERP system for the company.
2.Installed some more advanced testing
and production equipment, such as universal electrical tester.
3.Pin-Lam registration System for lamination,
Laser drilling machine, AOI, etc.
4.Enhanced our production capability
for PCB with a high layer count up to 24-layer.
5.Started production for Microvia or
HDI boards.
6.Our second factory at Fogang, Guangdong,
started mass production in early 2003 and had almost full
capacity by end of the year.
2004
1.Another phase of expansion for the second
factory at Fogang, Guangdong.
2.Fune-tune the ERP system implemented.
3.Plan to build a new factory for HDI
products.
4.Further implement the Environmental
Management System.
5.Install the horizontal PTH line and
horizontal pattern-plating line for the Microvia boards.